All-in-one platform for solar installers.

Run sales, design, permitting, install, and finance on one connected record — from first call to PTO and every install after.

Sales CRMProposalsPermitting & AHJInstall opsJob costingMilestone invoicingInventoryHR & crews
Modular workflows

Flexible solutions for every solar business model.

Grow with a comprehensive set of solar operations tools - designed to work individually or together.

The backbone of solar operations.

9workflow stages represented in the product model
7module families described for early-access walkthroughs
1connected record concept from first call to closeout
0customer usage metrics claimed on this page
Built for operators

Powering solar teams of every size.

Different installers run different plays — owner-led crews, residential growth teams, and commercial operators. They all need the same connected record underneath.

High velocity

Residential solar teams

Standardize every job package, reduce permit rework, and keep sales, ops, and finance aligned while volume grows.

Pipeline reviewCrew planningBilling queue
Integration planning

Map the systems Solar1 needs to meet.

Early-access walkthroughs start by identifying the CRM, accounting, document, and design handoffs your team already uses. From there, Solar1 can scope the cleanest rollout path.

View integrations
permit.updated
{
  "project": "Desert Sun - Elm St",
  "ahj": "Scottsdale",
  "status": "correction_required",
  "invoiceMilestone": "blocked",
  "crewDate": "reschedule"
}
Accounting mappingDocument packet handoffDesign import planning
Connected stack

Integration candidates, not launch claims.

The visual below shows the kinds of systems a Solar1 rollout may need to connect. Exact connectors and import paths are confirmed during implementation planning.

Plan the connection points. Scope the CRM, inventory, finance, crew, and document systems your rollout needs before claiming a connector is live.

What is happening

Field notes for solar operators.

Read the blog
Operations

The hidden cost of permit resubmissions

How small AHJ misses create weeks of drag across sales, install, and cash collection.

Read more
Finance

Why job costing has to start before install

Margin control works when labor and materials hit the project record in real time.

Read more
Data

PTO timelines installers should benchmark

A practical way to compare utility and AHJ bottlenecks across markets.

Read more

Ready to run on one record?

Request early access, or talk with us about replacing the stack your installers already outgrew.