Assess how project stages, documents, owners, and exceptions should share context.
One operating record for solar. From first lead to PTO.
Start with the workflow an installer already runs, then map the project records, owners, approvals, and system handoffs a configured rollout would require.
Currently onboarding a first group of early-access installers.
solar1erp.com/app/operations
Active Jobs
Active Jobs
47
+6 this week
On Track
91%
43 of 47
Pending PTO
8
utility queue
Recent Activity
Hernandez — 12.4 kW Res
InspectionPatel — 48 kW C&I
InstallChen — 7.2 kW Res
PermittedThompson — 22 kW C&I
PTOThe problem is not one missing feature. It is the handoff.
Most solar teams can sell, permit, install, and invoice. The pain starts when each step lives in a different system and the project has to be reconstructed by hand.
Sales, permitting, install operations, and job-cost context stay attached to the same project instead of being rebuilt at each handoff.
The platform is organized around surveys, proposals, AHJ work, inspections, interconnection, PTO, and milestone billing.
Solar1 is onboarding a first group of installers with guided setup, not a self-serve promise or a generic login flow.
Keep the project intact as it moves between teams
The assessment identifies which lead, survey, proposal, permit, install, and billing context needs to move with the project, and where each record remains authoritative.
See Solar Sales CRMPut margin context where the job is actually moving
Review how equipment, labor, subcontractor, and milestone-billing context should attach to the project, including which accounting system owns the final ledger.
See install operationsFive operating areas to map before Solar1 is configured.
Each module starts with the records your team already trusts, then turns the unknowns into explicit implementation decisions.
Map project cost and billing context without claiming a completed accounting implementation.
Define what must move from lead and proposal work into delivery.
Review assignment, time, certification, and access needs around active projects.
Start from the decisions each role needs to make and the records those answers require.
A rollout path that names the decision before the configuration.
Solar1 should not be dropped on top of messy operations. The assessment turns the way your team already works into a controlled rollout plan: what stays authoritative, what gets configured, what must be tested, and who needs to be enabled.
- 01Assess
Start with the system your team already trusts
Map the current tools, project records, owners, approval paths, and exceptions before changing how work moves.
- 02Configure
Shape Solar1 around real handoffs
Define stages, fields, permissions, notifications, and role views around the workflow your team actually runs.
- 03Validate
Test representative projects before rollout
Walk through sample jobs, edge cases, acceptance checks, and reporting needs before broader operational use.
- 04Enable
Train by role, then expand with control
Confirm owners, training notes, operating rituals, and review cadence so the team knows what changed and why.
Rollout responsibility
Know when each implementation question gets answered.
The workflow assessment begins the process; configuration, validation, and enablement each have a distinct job before wider operational use.
| Capability | Assessment | Configuration | Validation | Enablement |
|---|---|---|---|---|
| Current systems and record ownership | Included | Partial | Not available | Not available |
| Stages, fields, roles, and approvals | Included | Included | Partial | Partial |
| Representative project records | Partial | Partial | Included | Partial |
| Acceptance criteria and exception handling | Included | Partial | Included | Partial |
| Role training and operating ownership | Partial | Partial | Partial | Included |
Included means the topic is a primary focus in that phase. Partial means it may be revisited as the rollout develops.
Common questions
Solar1 platform — answered directly.
Is Solar1 a finished self-serve platform?
Solar1 is in early access. The current path is to request access, walk through your workflow with us, and decide together whether your team is a good fit for the first installer group.
Which workflows are the focus right now?
The assessment covers project operations, finance context, sales and customer handoffs, workforce coordination, and the reporting decisions each role needs to make.
Why call it a platform instead of a CRM?
A CRM stops around the signed contract. Solar1 is structured for the handoff after the sale: permit work, install milestones, field updates, job costs, billing triggers, and PTO.
Walk through the Solar1 operating record.
Show us how a job moves through your team today, and we will map the same workflow across the Solar1 platform.