Site survey
Give designers a reviewable survey package tied to the correct site, visit, evidence type, and survey version.
Design and proposals
Keep technical and commercial assumptions traceable from the site visit through the proposal version accepted for delivery.
Three workflows to examine
Give designers a reviewable survey package tied to the correct site, visit, evidence type, and survey version.
Preserve what changed between design options and which technical assumptions support the version selected for a proposal.
Connect each proposal scenario to the technical and commercial inputs that must survive acceptance and the operations handoff.
Operating context
Questions to settle
The assessment defines how design inputs, provider outputs, internal review, and engineering documents should be recorded; provider scope must be validated separately.
Option structures can be mapped for equipment, storage, commercial terms, and other approved variables while keeping each version traceable.
The accepted design, equipment, pricing, and customer decision can become a controlled handoff snapshot after readiness checks are complete.
Next step